By selecting and implementing the construction plan and technology of main shaft skip loading room at Zhaolou Mine,the paper introduced the adopted solution which fixed the problem during the construction of two-side arrangement skip loading room in the deep shaft under the big inflow condition.
本文通过对赵楼矿井主井箕斗装载硐室施工方案和施工工艺的选择与实施,较好解决了深井、大涌水条件下双侧布置箕斗装载硐室施工难题。
Damping leakage layer has been adopted in terminal air distributing unit of airclean system An idea of damping leakage was obtained from another train of thought by which the filtrating air,uniformizing flow and caulking leakage of terinal unit has been decoupled It can damp leakage and change airflow easily,effectively and economically It is a new idea of air distributing uni
在空气净化系统末端分布装置中采用了阻漏层。
CopyRight © 2020-2024 在线英语词典[www.yycidian.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024103067号