The preliminary scheme proposed is support reinforcement,and the final scheme is support post with man-excavated pile and bolting is put into practice.
针对浙东某山区危石的危害、规模、分布特征和稳定状况,提出了支撑加固方案,经过比选优化,根据施工反馈信息的调整,最终采用人工挖孔桩支挡柱加固方案,施工后效果良好。
CopyRight © 2020-2024 在线英语词典[www.yycidian.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024103067号