Based on the hydrographical and geological conditions and real-measured engineering data(including broken piles)of a wharf at the Yangtze Estuary section, it gives an analysis and research to the functional mode of wharf foundation pile under flood tide torrent.
结合长江河口地区某码头处的水文地质条件 ,工程 (包括断桩 )实测资料 ,对涨潮急流作用条件下码头基桩的工作性状加以分析研究。
CopyRight © 2020-2024 在线英语词典[www.yycidian.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024103067号