Combined with general engineering situations the post-construction method of cast-in-place reinforced concrete coal hopper is introduced.
根据施工巨宏热电厂现场的实际情况,介绍了现浇钢筋混凝土煤斗采用后施工的方法,经过施工达到了整个工程的工期和质量目标,给项目管理带来了较好的施工效益。